
1) Drilling technology
Found on
https://www.crosswordclues.com/clue/geosteering

From 2D and 3D models of underground substructures, deviated wells (2D and 3D) are planned in advance to achieve specific goals: exploration, fluids production, fluids injection or technical. A well plan is a continuous succession of straight and curved lines representing the geometrical figure of the expected well path. A well plan is always proj...
Found on
http://en.wikipedia.org/wiki/Geosteering
No exact match found.