
1) Efficiency measurement
Found on
https://www.crosswordclues.com/clue/response-time

In technology, response time is the time a system or functional unit takes to react to a given input.
Found on
http://en.wikipedia.org/wiki/Glossary_of_fuel_cell_terms
[technology] In technology, response time is the time a system or functional unit takes to react to a given input. == Computing == Response time is the total amount of time it takes to respond to a request for service. That service can be anything from a memory fetch, to a disk IO, to a complex database query, or loading a full web page. Ig...
Found on
http://en.wikipedia.org/wiki/Response_time_(technology)

The time it takes the call centre to respond to transactions that do not have to be handled when they arrive (e.g., correspondence or e-mail). See Service Level.
Found on
http://www.confero.co.uk/glossary.htm

duration between the instant of a step change in the measured quantity and the instant when the output signal reaches for the first time a specified percentage of its final value, that percentage being usually taken as 90 %
Found on
http://www.electropedia.org/iev/iev.nsf/display?openform&ievref=394-39-09

the time from a sudden change of a control quantity until the corresponding change of an output quantity has reached a specified fraction of its final value
Found on
http://www.electropedia.org/iev/iev.nsf/display?openform&ievref=431-02-12

time required for the change of detector output to reach, after a step variation of a steady detector input, a given percentage of its final value
Found on
http://www.electropedia.org/iev/iev.nsf/display?openform&ievref=845-05-58

Time it takes for a pixel to turn on or off
Found on
http://www.sony.co.uk/glossary/ShowGlossary.action?site=odw_en_GB§ionty

The time for a measurement device's output signal to reach 99% of its final value after a step change in the applied input.
Found on
http://www.youngco.com/young2.asp?ID=4&Type=3

The length of time required for the output of a transducer to rise to a specified percentage of its final value as a result of a step change of input.
Found on
https://www.encyclo.co.uk/local/20850

The gap between the time when a user initiates an action and the time that the action displays its results.
Found on
https://www.encyclo.co.uk/local/22803

A measure of the time taken to complete an operation or transaction. Used in capacity management as a measure of IT infrastructure performance, and in incident management as a measure of the time taken to answer the phone, or to start diagnosis.
Found on
https://www.encyclo.co.uk/local/22879
No exact match found.