Early Bird Report

At the end of owl shift the Main Control Room crew chief writes a one page summary of the past 24 hrs and the proposed schedule of accelerator operations for the next 24 hrs. This summary is then posted on the bulletin board outside the west MCR entrance with the last 24 hrs of the log book.
Found on http://www-bdnew.fnal.gov/operations/accgloss/gloss.html